Self-Test D-4.1 Drainage System Testing Code Requirements
Complete Self-Test D-4.1 and check your answers.
- For what period of time shall a drainage or venting system hold a water test before it is passed by the inspector?
- 15 min
- 20 min
- 25 min
- 30 min
 
- What pressure shall drainage or venting systems hold during an air test?
- 15 kPa (2 psig)
- 21 kPa (3 psig)
- 35 kPa (5 psig)
- 56 kPa (8 psig)
 
- During a ball test, what size ball shall a 3 in. drain be able to pass before the inspector accepts the installation?
- 75 mm
- 50 mm
- 38 mm
- 62 mm
 
- The final test of a plumbing system is performed after all of the fixtures are installed and put into operation.
- True
- False
 
- When testing drainage and venting installation for leaks with water (water pressure test), the pipe must be fitted with a standpipe for the introduction and observation of test water. What is the minimum height requirement for such a standpipe?
- 1.5 m
- 2 m
- 3 m
- 4 m
 
- In certain instances, a code official may require a final test on the DWV system. The substance used will be either smoke or 25 mm air pressure.
- True
- False
 